Track recordPV-1996 · Dossier

Everything asked, done in about four weeks, on a contract scoped for six to twelve months.

Bank of America, 1998: about a quarter million free-text inventory entries, and every one had to be declared Y2K compliant or not.

Org
Bank of America
Role
Consultant and software engineer, via Arsenal Technology
Period
1998, Y2K remediation
Data
An MS SQL asset database of roughly a quarter million free-text entries

The dossier

Situation

Bank of America had acquired many small banks, and Y2K compliance turned that into a real problem. Questionnaires had produced its system of record: an MS SQL asset database of roughly a quarter million inconsistent free-text entries, hardware and software alike. A staff of twelve to sixteen was chasing clarifications and vendor compliance declarations, and the backlog was large.

Objective

Document every entry as Y2K compliant or not, along with the vendor engagements and the dispensations for items that could not otherwise be verified.

Action

  1. Built the reference universe. Wrote tools to ingest Microsoft’s hardware compatibility catalog, scraped vendor product catalogs, and published Y2K compliance lists into one normalized database.
  2. Built the fuzzy matcher. An MS Access front end whose matching engine updated strong matches with vendor, product and compliance data automatically, and ranked possible matches for the rest.
  3. Closed the loop with IT. Fed results from IT’s bootable compliance test back into the master inventory, and wrote an extension to drop a very common 90 MHz PC to a lower clock speed so it could be validated.
  4. Built the vendor tracker. Designed it by hand in pseudocode, then built a classic ASP site that walked staff through each remaining vendor issue to compliance documentation or an exemption.

Result

To finish everything asked, on a contract scoped for six to twelve months
4 wks
Follow-up staff still needed, down from twelve or more
2 to 3
  • Everything asked of a six to twelve month contract was done in about four weeks.
  • The twelve-plus follow-up pool was reduced to a core of two or three.
  • The bank and I ended the contract early by mutual agreement, at a large savings against its budget.
  • Stayed on to about six weeks in all for support, then handed the codebase off.

Leadership

Approach
Design the solution in the abstract first, then implement. The vendor tracker went from pseudocode on paper to working code in a day or so.
Partnership
Worked with IT, whose bootable compliance test filled in the records we had no compliance data for.
Delivery
Automated the matching, so a follow-up pool of twelve-plus became a core of two or three.

This is the kind of work behind the fractional CISO and CTO offer.

Book

Bring the problem.
Leave with the next three moves.

Length
30 minutes
With
Paul, directly
Reply
Within 24 hours
After
Scoped and priced in writing after a 30-minute call.
Book a 30-minute intro call

30 minutes, directly with Paul. Or write to paul@vilevac.com